Road clothes and coatings
Sold <10Product description
1. Theoretical part 3
1.1 determination of the strength of the pavement. Methods and methods of measurement 3
1.2 Care for excess binder 6
1.3 the Performance and turnaround time of pavement and pavement 12
2. Practical part 22
Task 1 22
Task 2 24
References 25
OPTION 22
Task 1
Calculate the required amount of material for the repair of asphalt concrete pavement by surface treatment according to the data given in the table.
Task 2
Calculate the required number of snowplows for patrol snowplows. The formula for determining the number of snow plows
Main features
- Content type File
- Content description 297 kB
- Updated on the site 02.07.2020
Additional description
Reviews
No reviews yet
Cumulative discount
| 100 $ | the discount is 10% |
| 50 $ | the discount is 5% |
| 20 $ | the discount is 2% |
Amount of purchases from the seller: $
Your discount: %
Cumulative discount
| 100 $ | the discount is 10% |
| 50 $ | the discount is 5% |
| 20 $ | the discount is 2% |
Amount of purchases from the seller: $
Your discount: %
You viewed
All images, logos, and names of games, programs, and other products used are taken from public sources and are for informational purposes only. All trademarks, logos, names, and other intellectual property belong to their respective owners. Use of such images on the website does not imply any affiliation or connection with the copyright holders.