Task 40 The pipeline consists of three sections

Task 40 The pipeline consists of three sections

Sold <10
0 000 X
There are no such quantities in stock
By clicking the button, you agree to terms for buyers
Secure deal
Instant delivery

Product description

Task 40 The pipeline consists of three sections connected in series with each other. The diameters and lengths of the material and the condition of the pipes are known. The marks of the initial A and final B sections of the complex pipeline are also set. At point A there is a concentrated flow Q, at the second site there is a uniformly distributed flow Qp. At point B, the value of the free head hcv is set. Determine the costs on the sections and the required pressure of the Ntr at point A, taking local losses of 10% of the losses along the length.
d1 = 150mm, d2 = 200mm, d3 = 250mm, L1 = 150m, L2 = 100m, L3 = 200m, cast iron new, bituminized, A = 112m, B = 118m hcv = 5m, Q/Qp = 60/21 l/s.

Main features

  • Content type File
  • Content description 44,42 kB
  • Updated on the site 11.08.2022
The solution is made in the Word editor with a set of formulas. The task is performed as part of the control work on hydraulics. After payment, we guarantee to receive a file with this task. It is possible to perform according to your tasks.

Reviews

No reviews yet

0 000 X
There are no such quantities in stock
By clicking the button, you agree to terms for buyers
Task 40 The pipeline consists of three sections
0 Sold <10
0 000 X
Secure deal
Instant delivery

You viewed

All images, logos, and names of games, programs, and other products used are taken from public sources and are for informational purposes only. All trademarks, logos, names, and other intellectual property belong to their respective owners. Use of such images on the website does not imply any affiliation or connection with the copyright holders.